Johns Manville Roofing System CAD Details Search using keywords: geotextile slope protection
E-DV-08 Primary Drain Sump - Low Slope - Less than 3:12 Slope
E-DV-09 Primary Drain Sump - Steep Slope - Greater than 3:12 Slope Mech. Att.
E-DV-10 Primary Drain Sump - Steep Slope - Greater than 3:12 Slope Adhered
E-MS-13 Slope Transition-Valley
E-MS-14 Slope Transition-Ridge
E-PT-01 Support-Light
E-PT-02 Support-Medium
E-PT-03 Support-Heavy
E-PT-04 Walkway-Concrete Paver
E-PT-05 EPDM Peel & Stick Walkpads Over EPDM Membrane
E-PT-06 Ballasted EPDM
E-PT-07 Lightning Rod-Wall Mount
E-PT-08 Lightning Rod-Roof Mount
E-PT-09 JM ENRGY Anchor - EPDM
E-PT-10 Hurricane Peel Stop Anchor Bar
E-TI-01 EPDM Transition to Sloped Shingle Roof
3E-FW-T4 Presto-Tite Fascia on Sloped Parapet
P-DV-07 Primary Drain Sump- Low Slope- Up To 3:12 Slope
P-DV-08 Primary Drain Sump- Steep Slope- Greater Than 3:12 Slope
P-DV-13 Primary and Overflow Drain Sump (Low Slope) up to 3:12 Slope
P-MS-09 Slope Transition-Valley
P-MS-10 Slope Transition-Ridge
P-PT-01 Support-Light
P-PT-02 Support-Medium
P-PT-03 Support-Heavy
P-PT-04 Walkway-Concrete Paver
P-PT-05 PVC Walkpads Over Adhered PVC Membrane
P-PT-06 PVC Walkpad Fleece Backed System Fully Adhered
P-PT-07 PVC Walkpad Over Mechanically Fastened PVC Membrane
P-PT-08 Lightning Rod-Wall Mount
P-PT-09 Lightning Rod-Roof Mount
P-PT-10 Grease Trap
P-PT-11 JM ENRGY ANCHOR - PVC
P-PT-12 JM PVC Safety Strip Over PVC Membrane
P-PT-13 Hurricane Peel Stop Anchor Bar
P-FW-T3 Presto-Tite Fascia System On Sloped Parapet
BIT-16 Roof Penetration Pan
BIT-17 Lightning Rod on Roof Surface
BIT-PT-01 Bituminous Light Support
BIT-PT-02 Bituminous Medium Support
BIT-PT-03 Bituminous Heavy Support
BIT-PT-04 DynaTred Traffic Pads with Pavers
BIT-PT-05 DynaTred Traffic Pads
DFE-17 Lightning Rod, Surface Mount
DFE-16 Penetration Pocket
DFE-10 FP-10 One Way® Roof Vent
DFE-9 Plumbing, Lead
DFE-23 Vent Stack (Warm)
DFE-18 JM Energy Anchor - SBS Adhered
DGE-17 Lightning Rod, Surface Mount
DGE-16 Penetration Pocket
HW-16 Penetration Pocket
HW-17 Lightning Rod on Roof Surface
HW-18 JM Energy Anchor
CBE-17 Lightning Rod, Surface Mount
CBE-16 Penetration Pocket
PMF-1 PermaFlash® I-Beam Detail
PMF-11 PermaFlash® Square Metal Tube Detail
PMF-11S PermaFlash® Square Metal Tube Scrim Detail
PMF-1S PermaFlash® I-Beam Scrim Detail
PMF-2 PermaFlash® Angle Iron Detail
PMF-2S PermaFlash® Angle Iron Scrim Detail
T-FW-B7 Base Tie-in Knee Wall Brace 2/12 Slope
T-DV-07 Primary Drain Sump-Low Slope-Up To 3:12 Slope
T-DV-08 Primary Drain Sump-Steep Slope-Greater Than 3:12 Slope
T-DV-16 Primary Roof Drain Insert 6:12 Slope
T-MS-09 Slope Transition-Valley
T-MS-10 Slope Transition-Ridge
T-PT-01 Support-Light
T-PT-02 Support-Medium
T-PT-03 Support-Heavy
T-PT-04 Walkway-Concrete Paver
T-PT-05 TPO Walkpads Over Adhered TPO Membrane
T-PT-06 TPO Walkpad Fleece Backed System Fully Adhered
T-PT-07 TPO Walkpad Over Mechanically Fastened TPO Membrane
T-PT-08 Lightning Rod-Wall Mount
T-PT-09 Lightning Rod-Roof Mount
T-PT-10 Grease Trap
T-PT-11 JM Single Ply Safety Strip Over TPO Membrane
T-PT-12 JM ENRGY Anchor - TPO
T-PT-13 Hurricane Peel Stop Anchor Bar
T-FW- T3 Presto-Tite Fascia System On Sloped Parapet